  • Agents consistently mispredict dispatch results at the 3-year deterministic crossover point. This misprediction seems to be more severe than would be anticipated based on limitations of the decision algorithm. I need to: * Verify that the misprediction is real (rather than a postprocessing limitation) by saving interim agent forecasts of generation unit financial results * Identify possible causes of the issue and investigate each one * Develop a test case to conclusively identify when the issue has been fixed

    Overdue by 6 month(s)
    Due by October 10, 2025
    11/11 issues closed
  • Define a sensible set of two-factor tests based on the single-factor results, run the initial set, and characterize the results

    Overdue by 4 month(s)
    Due by November 28, 2025
    0/1 issues closed
  • Run a complete initial set of single-factor tests, review the results in detail, and determine that all behaviors are explainable. Set of single-factor tests will be described in individual issues and tagged to this milestone.

    Overdue by 5 month(s)
    Due by October 31, 2025
    6/6 issues closed