Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
Show all changes
21 commits
Select commit Hold shift + click to select a range
82ed004
FEAT: add backend server feature
PaperStrange Mar 17, 2025
ce2bb4b
DOCS: add project instructions and protocol back
PaperStrange Mar 18, 2025
b488e90
FEAT: add components and upd front-end framework
PaperStrange Mar 18, 2025
7831440
FIX: update api config
PaperStrange Mar 18, 2025
5ad99e7
Feat: add npm test case
PaperStrange Mar 19, 2025
bd3a566
Fix: use npm audit to fix vulnerablities
PaperStrange Mar 19, 2025
822c897
Docs: update issue templates and github action check file
PaperStrange Mar 19, 2025
58cffe5
Fix: test suite by addressing prop mismatches, API initialization ord…
PaperStrange Mar 20, 2025
a5942f6
Docs: refactor folder structure in ../src
PaperStrange Mar 20, 2025
bdc2200
Refactor: fix issue #4 update index file for version 0.4.0
PaperStrange Mar 20, 2025
ea7855c
Refactor: modify .js file to match the new folder structure
PaperStrange Mar 20, 2025
84beb01
Fix: fix issue #4 do two turns code review and refactors
PaperStrange Mar 20, 2025
5f88233
Docs: add api description file
PaperStrange Mar 20, 2025
9f212f9
Docs: fix issule #4 fix issule #5, refactor file loactions, add work…
PaperStrange Mar 21, 2025
1e65f54
Docs: manually update workflow
PaperStrange Mar 21, 2025
77c4ea4
Docs: renamed all plan files into the same naming convention
PaperStrange Mar 21, 2025
c6da13c
Docs: refactor workflow file and link back to other md files
PaperStrange Mar 21, 2025
047d4d2
Docs: apply OKRs and modify files location
PaperStrange Mar 21, 2025
a81f3c7
Feat: fix issue #5 add bulid files complete performance optimization …
PaperStrange Mar 21, 2025
359ff1d
Docs: fix issue #6 fix issue #7 add link back re-arrange project reco…
PaperStrange Mar 22, 2025
4422470
Docs: update workflow procedure for planning fix #issue 6
PaperStrange Mar 23, 2025
File filter

Filter by extension

Filter by extension


Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
98 changes: 98 additions & 0 deletions .cursor/.milestones
Original file line number Diff line number Diff line change
@@ -0,0 +1,98 @@
# TourGuideAI Project Milestones

## Phase 1: Initial Setup and Prototype (COMPLETED)
- **Object**: UI Framework Implementation
- Create basic UI framework
- Implement mock API interactions
- Set up development environment

## Phase 2: API Architecture (COMPLETED)
- **Object**: API Design & Simulation
- Design API interfaces for OpenAI and Google Maps
- Create simulation layer for testing
- Implement basic API interactions

## Phase 3: Real API Integration (COMPLETED)
- **Object**: External API Integration
- Replace mock implementations with real API clients
- Implement API key configuration
- Create enhanced testing tools for APIs
- **Object**: AI Text Processing
- Connect OpenAI GPT-4o for text processing
- **Object**: Location Services
- Integrate Google Maps APIs for location services

## Phase 4: Production Integration (COMPLETED)
- **Object**: Backend Integration
- Implement secure API key management
- Build server-side API proxying
- Develop authentication and authorization

- **Object**: Frontend Integration
- Connect components to real APIs
- Develop responsive user interfaces
- Enhance map visualization capabilities

- **Object**: Core Performance Foundation
- Implement caching strategy
- Develop rate limiting controls
- Create offline capabilities

- **Object**: System Reliability
- Develop error handling framework
- Build fallback mechanism
- Implement retry strategy

- **Object**: Quality Assurance
- Develop automated testing
- Implement usage monitoring
- Create performance benchmarking

## Phase 5: Performance Optimization & Production Readiness (COMPLETED)
- **Object**: Frontend Performance
- Optimize code loading and execution
- Enhance rendering performance
- Improve cache effectiveness
- Optimize asset delivery
- Implement offline experience

- **Object**: Production Infrastructure
- Establish automated deployment
- Develop environment management
- Implement automated testing
- Create monitoring infrastructure

- **Object**: System Stability
- Develop comprehensive testing
- Ensure cross-browser compatibility
- Validate performance under load
- Verify security controls

## Phase 6: Beta Release & User Feedback
- **Object**: Beta Program Infrastructure
- Build comprehensive beta testing portal with role-based access control
- Develop robust feedback collection system with ML-based categorization
- Create detailed analytics dashboard for monitoring beta usage patterns
- Implement structured issue prioritization framework with severity classification
- Enable automated feedback collection and analysis pipelines

- **Object**: User Experience Enhancement
- Establish UX audit system with session recording and heatmap visualization
- Design and implement 5+ high-impact features based on user demand
- Create quality issue tracking and resolution system with defined SLAs
- Optimize real-world performance across key user journeys
- Implement comprehensive UX assessment and scoring methodology

- **Object**: Analytical Capabilities
- Develop usage analytics system capturing complete user journey data
- Implement real-time performance monitoring with Prometheus and Grafana
- Create configurable A/B testing framework with LaunchDarkly integration
- Build privacy-first user behavior tracking system with GDPR compliance
- Establish predictive analytics capabilities for user behavior

- **Object**: User Documentation
- Create comprehensive user guide with tutorials for all core features
- Develop detailed developer documentation with OpenAPI specifications
- Build interactive API reference with sandbox testing environment
- Prepare marketing materials and demo content for broader adoption
- Implement multilingual documentation support with search capabilities
292 changes: 292 additions & 0 deletions .cursor/.project

Large diffs are not rendered by default.

Loading